A new pipe, wound ring by ring inside the old one

Spiral-wound lining of an 825 mm sewer, and the CCTV survey that walked the full 58 m after lining.

Looking down the new liner from the start manhole, and the liner end meeting the old pipe at the far end.
Looking down the new liner from the start manhole, and the liner end meeting the old pipe at the far end.
Pipe
825 mm sewer
Length
About 58 m, manhole to manhole
Method
Spiral-wound lining, PVC with steel
Survey
Post-lining CCTV

Look down this pipe and count the rings. Each one is a single turn of a PVC profile strip, locked to the turn beside it. Hundreds of them, side by side, make up a brand-new pipe. It was built inside the old sewer, in place, without a trench.

The sewer is 825 mm in diameter and runs about 58 m between two manholes in an industrial area of Singapore. The old pipe had done its years of service. Its wall was brown, rough and worn, as the last photo shows. Digging it up would have meant breaking open roads and driveways that businesses use every day. We renewed it from the inside instead.

Spiral-wound lining starts at ground level. A PVC profile strip is fed from a drum, down the manhole, into a winding machine. The machine turns the strip into a spiral and locks each new turn to the one before it. The new pipe grows and advances along the old one, turn by turn. Steel reinforcement wound in with the profile gives the liner its stiffness.

A liner is only as good as its proof. Once lining was complete, our CCTV team surveyed the full length. The camera travelled from manhole to manhole, recording the liner all the way. A jetting nozzle worked ahead of the camera. The frames at 10, 20, 30, 40 and 50 m all tell the same story: a round, smooth, continuous bore, with every turn of the profile tight against the next.

Look closely and you will see writing spiralling along the wall. These are the profile's production markings, wound into the pipe as it was formed. Every metre of the liner carries its own record.

At 58 m the camera reached the end of the lined length. Here the clean white liner meets the old pipe, and the difference is plain to see. On one side is a pipe at the end of its life. On the other is a smooth new bore, ready for many years of service.

Spiral-wound lining suits large sewers that cannot be dug up or easily taken out of service. If you have a large-diameter sewer or culvert to renew, talk to us about how we would line it.

The start of the survey, with the jetting nozzle working ahead of the camera.
The start of the survey, with the jetting nozzle working ahead of the camera.
The same liner at 10 m intervals along the 58 m length: round, smooth and continuous all the way.
The same liner at 10 m intervals along the 58 m length: round, smooth and continuous all the way.
The end of the lined length: the new liner meets the old pipe at the manhole.
The end of the lined length: the new liner meets the old pipe at the manhole.

Figures are taken from the project records. Client and site names are withheld.

Contact

Tell us about your pipeline.

Share the location, pipe size and material, length and the problem you are seeing. We will reply with next steps.

Headquarters
Perma-Liner Industries (Singapore) Pte Ltd
1 Bukit Batok Crescent, #09-58
WCEGA Plaza, Singapore 658064
Telephone
+65 6710 4262
What do you need?

Your enquiry is sent directly to our office. We will reply by email. See our privacy policy.